OLTAN VE KÖLEOĞLU E.E.Ü. A.Ş KARAMAN BIOMASS POWER PLANT 154 kV SUBSTATION and 154 kV OVERHEAD LINE

- 154 kV SUBSTATION EPC (4 FEEDER)
- 154 kV Overhead Line EPC
- Command and Control Center EPC
- MV Metal Clad Building EPC
COMPLETED PROJECTS

OLTAN VE KÖLEOĞLU E.E.Ü. A.Ş KARAMAN BIOMASS POWER PLANT